Uncategorized
Clair and his crew are continuing to work in the basement. State Electric delivered a good bit of our lights this morning, and they got to work installing the recessed can lights.
They also started drywalling the ceiling. This is the area above the mini kitchen.
The bathroom is the door on the left and the bedroom is the door on the right.
The area on the left is a play area ? it’s one of the ones that had to have the ceiling lowered because of the vents and water pipes. The door in the middle leads to a storage room, and the stairs are on the right.