Clair and his crew are continuing to work in the basement. State Electric delivered a good bit of our lights this morning, and they got to work installing the recessed can lights.

477_1

 

They also started drywalling the ceiling. This is the area above the mini kitchen.

477_2

 

The bathroom is the door on the left and the bedroom is the door on the right.

477_3

 

The area on the left is a play area ? it’s one of the ones that had to have the ceiling lowered because of the vents and water pipes. The door in the middle leads to a storage room, and the stairs are on the right.

477_4