Basement update

Basement update

Clair and his guys were working on the basement again today. All of the doors have handles now, and he is working on finishing the plumbing. On the left are the stairs going up to the main floor. The next door is to a storage room. The two poles will eventually be encased with columns that run down onto an island countertop. There will be cabinets under the island and along the back wall. In the very middle of the picture, you can see the plumbing for small sink. The right-hand closed door is the bathroom, and on the far right, the open door leads into the bedroom.

531_1

 

They also cut the holes in the ceiling for our surround sound speakers.

531_2

10/25/2010

POSTED
Uncategorized
CATEGORY

Leave a Reply

Your email address will not be published. Required fields are marked *

THANK YOU
subscribe YO-SELF