The DOH has put in three of the eight culvert pipes into the ditch along the front of the property.
They still have a ways to go, but a lot of the hard work is behind them.
The hole is all dug out, so now they just have to place the pipes and connect them.
There will be two drop inlets in between the pipes to allow water to drain in. One will be at the end where the pipe meets the one that runs under the road.
The inlet that they brought was made for 36″ culvert, and they required us to use 45″, so they spent a good bit of the day trying to make the holes larger.