Uncategorized
We’re still working on getting the basement finished. Today, Clair came and got everything ready in the shower, so Rick can come and tile it. Clair ran all the plumbing, built the bench (that covers some extra pipes) and added nailer boards for the tile backer boards. The shower will be 42″ x 48″, including the bench.